CLARENDIS
CLARENDIS
Continuity of design data

BIM Interoperability & Construction Site Monitoring

We deploy solutions connecting your digital models (BIM) directly to the field to facilitate execution monitoring and reduce construction site errors.

← Back BIM Interoperability & Construction Site Monitoring
01 — STRATEGIC CONTEXT

BIM Interoperability & Construction Site Monitoring

On a property development site, the BIM model contains everything: the dimensions, the materials, the services, the openings.

But between the design office and the site, this data is lost. The site manager prints PDF drawings, notes observations on paper, re-enters them into a spreadsheet in the evening. The next day, a modification arrives from the architect: new IFC version: and no one knows whether the site teams are working with the correct information. Snagging items accumulate in emails, technical approvals drag on, and when it comes to justifying a delay to the client, the history is reconstructed from three contradictory sources.

Meanwhile, execution errors: a duct in the wrong location, a suspended ceiling too low: generate remedial works that cost between 2 and 5% of the construction budget. This is not a problem with the teams’ competence. It is a continuity problem: the data exists, it is simply inaccessible where it would be useful.

This solution belongs to the Data, Master Records & Reporting family.

BIM Interoperability & Construction Site Monitoring
02 — VALUE LEVERS

Challenges holding back your performance

The Transformation Opportunity:

Excel and generic monitoring tools do not speak BIM. It is impossible to automatically extract a joinery schedule or link a reservation to a specific object in the model.Result: permanent double entry, risk of error at each transcription. BIM collaborative platforms, meanwhile, are designed for design offices, not for construction sites. Complex interface, internet connection required, extensive training: the site manager returns to his notebook. As for generalist service providers, they offer standard connectors which ignore your naming conventions, your validation workflows, your package constraints.Ultimately, each project reinvents its own monitoring system, impossible to capitalise from one operation to another.

03 — THE APPROACH

Our Technical Approach

Our approach stems from a simple observation: the BIM model is a database, not merely a 3D drawing.

We construct bridges that extract structured information: specifications, locations, technical attributes: and render it exploitable on-site, within interfaces tailored to each use case. A works manager accesses quantities for a package without opening Revit. A reservation raised on tablet automatically geolocates within the model.

A technical visa modifies the status of a BIM object without manual intervention. The intelligence lies in the mapping: we model your business conventions, your construction phases, your approval workflows. This is not blind synchronisation between two software applications, it is contextual translation that respects your teams’ logic. The model becomes the single source of truth, fed by the field as much as it informs it.

Automated extraction of BIM schedules

Management of snagging clearances

Technical approval traceability

04 — ARCHITECTURE & TECH

Technical Architecture

Three-step diagram linked by arrows: multiple sources, then master record and checks, then reporting and analysis.

Several sources, one master record to arbitrate between them, then analysis: Core HR & Unified Repository and Observatories & Open Data stem from this same chain.

  • Automated extraction of BIM schedules
  • Management of snagging clearances
  • Technical approval traceability
05 — DEPLOYMENT METHODOLOGY

Smooth and frictionless integration

We work with your existing tools: Revit, ArchiCAD, or any standard IFC export. The existing site monitoring system: even a simple SharePoint: can serve as an entry point. No need to replace your document management system or project management software.

We deploy by batch or by phase, on a pilot operation, with the teams who will operate the system. Practices change progressively, historical data remains accessible.

01

Audit of current workflows

Analysis of your standard models, your field tools and your validation processes on a representative operation.

02

Business mapping design

Definition of BIM extraction rules, correspondences with your internal nomenclatures and approval workflows.

03

Pilot deployment

Implementation on a specific package or construction phase, including training for site users and adjustments under actual conditions.

04

Generalisation and Capitalisation

Extension to other packages, documentation of parameters for replication on your future operations.

06 — KEY BENEFITS

Measurable results for your organisation

  • 60 to 80% reduction in construction site meeting preparation time
  • Measured reduction in rework related to drawing interpretation errors: -30% observed on initial projects
  • Complete traceability of approvals: who validated what, when, on which version
  • Extraction of schedules within minutes instead of days of re-entry
  • Geolocated snagging clearances within the model, with history accessible to all stakeholders
  • Cross-project capitalisation: consistent data structure from one operation to another
07 — FREQUENTLY ASKED QUESTIONS

Clarifying your decision-making

Our subcontractors do not use BIM, how does it work with them?

Subcontractors do not need access to the model. Clarendis generates simplified views — annotated PDF drawings, task lists, snagging forms — that synchronise with the central model. Their input feeds back without any change to their working practices.

What configuration effort is required to adapt the system to our internal conventions?

Initial configuration takes 2 to 3 weeks with your methods teams, mapping your BIM attributes, phases and validation workflows. That work is reusable on subsequent operations and pays for itself from the second project onwards.

Ready to deploy BIM Interoperability & Construction Site Monitoring in your organisation?

Let's discuss your context and define your roadmap together.

Book a 45-min call

A question about your specific situation? We discuss it on our forum.

Skip to main content